...instrukcja serwisowa w pełni czytelna i kompletna. Dziękuję!
Tekstowy podgląd strony 19 (kliknij aby zobaczyć)
CDX-M630 SECTION 3 PHASE ALIGNMENT
3-1. ARM (A-L) ASSY, ARM (B-L) ASSY
3 arm (A-L) assy
4 stop ring 1.5, type-E
2 stop ring 1.5, type-E 1 arm (B-L) assy
bracket (L) assy
3-2. CAM (L)
1 Move the arm (B-L) assy in the direction of the arrow A and the arm (A-L) assy in the direction of the arrow B fully (full open state). 2 Align the hole (large) on the cam (L) with part C and install the cam. 4 Turn the cam (L) clockwise and counterclockwise to verify that both the arms are operated. 3 stop ring 1.5, type-E