Wall unit mounting - Fig. 6
� Mark the wall with a centre line, this will aid mounting procedure (1), position the template so that the mid line printed on the template matches with the centre line previously drawn, the lower side of the template corresponds to the lower side of the hood once mounted (2). � Drill two holes � 8mm and fix the support bracket with two wall plugs and screws (3). Hang the hood (4) and adjust its position (56). � From the inside of the hood sign two points for definitive fixing (7). � Remove the hood (8) and drill two holes � 8mm (9), fit two wall plugs (10). � Drill two holes � 8mm on the upper side close to the ceilling, fit two wall plugs (11) (In case the hood is to be used in recirculation version, mount the deflector F on the chimney support with 2 screws) and fix the chimney support G with two screws (12). � Hang the hood again (13) and fix it definitively with two screws (14). � Fit an exhausting pipe (15) to connect the outlet hole B of the hood to the outside (Extraction version) or to the deflector F (Filter version). � Make electrical connection (16). � Fix the chimney first up (17a) to the chimney support (17b), then slide the lower section of the chimney down into the proper housing on top of the hood (18).