Documentation made available quickly and It is good quality. Thanks.
Tekstowy podgląd strony 32 (kliknij aby zobaczyć)
4. MECHANICAL ADJUSTMENTS
1. MECHANICAL CHECKS
If irregular operation occurs or when reassembling a part, please check the following. 1) Make sure that the datum hole of the RELAY PLATE meets that of the MAIN BASE in the Eject Mode as shown in Fig. 4-1. 2) Make sure that the datum hole of the CAM GEAR meets that of the MAIN BASE in the Eject Mode as shown in Fig. 4-1. 3) There are two triangle mark in the MODE SWITCH. When installing the L/C BRKT ASS'Y, make sure that the one marks meets the other in the Eject Mode as shown in Fig. 4-2. 4) Make sure the that the BOSS of the PINCH LEVER ASS'Y is located outside of the CAM of the CAM GEAR in the Eject Mode as shown in Fig. 4-2. 5) Make sure that the datum hole of the MAIN PLATE meets that of the MAIN BASE in the Eject Mode as shown in Fig. 43. 6) When installing the RELAY GEAR, make sure that the triangle mark meets the last groove of the teeth of the MAIN PLATE in the Eject Mode as shown in Fig. 4-3. 7) Make Sure that the triangle mark of the L LOADING GEAR ASS'Y meets the -Shaped mark of the R LOADING GEAR ASS'Y in the Eject Mode as shown in Fig. 4-4. 8) Make sure that the 1'st tooth of the R LOADING GEAR ASS'Y meets the 1'st groove of the LOADING GEAR ASS'Y in the Eject Mode as shown in Fig. 4-4.