Gruba instrukcja - poprostu wszystko co potrzreba - polecam .
Tekstowy podgląd strony 19 (kliknij aby zobaczyć)
INSTALLATION
Handlebars (FIG. 27)
Attach the handlebars with the start lever (5) at a suitable height on the right-hand frame (25) and tighten the screws to 10 Nm. Attach the weight (A) to the rear end of the handlebars.
FIG. 27
Band Cleaning Tank (FIG. 28)
The tank (3) is placed on the mounting located on the right-hand side of the sawmill. The band cleaning fluid flow is regulated with a continuously variable manual valve on the tank (FIG. 28A). The tank (3) can be easily removed from the sawmill. The spiral hose is inserted through the hole in the band guide (8) and is connected in the hole on the plate mounted on the adjustable band guide. The fluid can then run down and clean the bandsaw blade.