5. Mount the RAID board. (1) Mount the RAID board so that the mounting holes (q to r) of the RAID board are aligned with the mounting holes (q to r) of the main unit (WJND300) respectively by referring the illustration.
(1) Use the HDD cable holding clamps attached to the RAID board to bundle two of the HDD cables each disconnected in Step 2. (2) Connect all of the HDD cables and 3 cables to the RAID board.
q
HDD cable holding clamp
Pass the HDD cable for HDD1 (HDD3) through the pull-ring of the cable for HDD2 (HDD4).
q r e e r w w
(2) Secure the RAID board to the main unit with the screws (6 screws with washer for top of the board, 2 screws for rear of WJ-ND300, and 1 flat-head screw for side of WJ-ND300) attached to the board.
7. Put the top cover back and secure it with the screws removed in Step 1.
q y r w e t
u o
Flat-head screw
i
6. Connect the cables to the RAID board. The original positions of the HDD cable connectors on the main board of the WJ-ND300 and the positions of the RAID board are as shown in the illustration below (Fig.1).