9. Adjust the leveling bolt until support angle is level. Tighten the leveling bolt locknut. This allows air conditioner to tilt back slightly for proper condensate disposal. NOTE: Be sure the window track is securely attached to the building construction. Use longer screws into the subframing if necessary. Do not drill a hole in the bottom pan. The air conditioner is designed to operate with approximately W� of water in the bottom pan.
Top retainer (Step 17) Foam seal Filler panel (Step 17)
10. Cut two pieces of adhesive back foam seal equal to the height of the
window opening. Remove backing and apply to the vertical inside edges of the window frame and sliding sash that will rest against the air conditioner. 11. Replace the sliding sash in the window frame.