INSTALLING THE COOKER HOOD
Drilling the Ceiling/Support Shelf
� Use a plumb line to mark the centre of the hob on the ceiling/support shelf. � Place the drilling template 21 provided on the ceiling/ support shelf, making sure that the template is in the correct position by lining up the axes of the template with those of the hob. � Mark the centres of the holes in the template. � Drill the holes at the points marked: � For concrete ceilings, drill for plugs appropriate to the screw size. � For hollow brick ceilings with wall thickness of 20 mm: drill ø 10 mm (immediately insert the Dowels not provided). � For wooden beam ceilings, drill according to the wood screws used. � For wooden shelf, drill ø 7 mm. � For the power supply cable feed, drill ø 10 mm. � For the air outlet (Ducted Version), drill according to the diameter of the external air exhaust duct connection. � Insert two screws of the following type, crossing them and leaving 4-5 mm from the ceiling: � For concrete ceilings, use the appropriate plugs for the screw size (not provided). � For Cavity ceiling with inner space, with wall thickness of approx. 20 mm, Screws not provided. � For wooden beam ceilings, use 4 wood screws (not provided). � For wooden shelf, use 4 screws with washers and nuts (not provided)
Fixing the Frame
� Loosen the two screws fastening the lower chimney and remove this from the lower frame. � Loosen the two screws fastening the upper chimney and remove this from the upper frame. If you wish to adjust the height of the frame, proceed as follows: � Unfasten the eight metric screws joining the two columns, located at the sides of the frame. � Adjust the frame to the height required, then replace all the screws removed as above. � Insert the upper chimney stack from above, and leave it running free on the frame. � Lift up the frame, �t the frame slots onto the screws up to the slot end positions. � Tighten the two screws and fasten the other two screws provided with the hood.