...instrukcja serwisowa w pełni czytelna i kompletna. Dziękuję!
Tekstowy podgląd strony 30 (kliknij aby zobaczyć)
(3) Wiring of the power board block (for assembling the board block sub assembly) (a) Wiring of the ballast block before it is placed on top of the power board.
Connect the CNPWR to the CN1 connector, and make sure that it is perfectly locked. Power board
CNPWR
CN1
(c) Outline of the ballast board after it has been placed on top of the power board.
Squeeze the CNPWR cables into the left hand side of the power block before connecting the power air intake fan, also make sure that the CNBAR cables have been passed through the ballast holder slots.
(b) Wiring of the ballast board when it is placed on top of the power board.
Pull the CNPWR cables to the left (in the direction of the arrow in the diagram below), when placing the ballast board on top of the power board. (The cables may come into contact with the spinning blades of the power air intake fan to the right.) Ballast board
CNTH #3054 leads CNBAR
Make sure that the CNBAR does not droop on top of the ballast board. (Maintain a safe distance.) (Prevents the CNBAR from coming into contact with the fan blades.) Make sure that the lines do not protrude from the notch of the ballast cover. (Prevents tangling.) Power board
CNBAR Lamp leads
Connect the CNTH cable to the E950 sensor board's connector.