5. Wiring before Upper Case Installation
Push the #680 lead surplus and the PAS2 under the drive board.
#680
Check that the peripheral cables are kept away from the lamp holder since the lamp cannot be replaced if any one of the peripheral cables is laid on the lamp holder.
CP-X880/CP-X885
A83 CNPW2 CNRM
36
Push the cable surplus under the drive board so they cannot be jammed in the upper case when it is installed.
Boss Rib
#6606
CNPW1
#6607 CNBAR
Push the cable surplus under the drive board so they cannot be jammed in the upper case when it is installed. Lay these cables inside the bosses and the rib on the ballast holder.