� Mark the wall with a centre line, this will aid mounting procedure (1), position the template so that the mid line printed on the template matches with the centre line previously signed, the lower side of the template corresponds to the lower side of the hood once mounted (2). � Drill two holes � 8mm and fix the support bracket with two wall plugs and screws (3). � Hang the hood (4) adjust its position (5-6) and from the inside of the hood mark one point for definitive fixing (7), remove the hood and drill a hole � 8mm (8), fit a wall plugs, hang the hood again and fix it definitively with a screw (9). � Drill two holes � 8mm on the upper side close to the ceilling (10), fit two wall plugs and fix the chimney support with two screws (11). In case the hood is to be used in filter version, mount the deflector F on the chimney support with four screws 2,9x6,5 and fit a vent hose (12 - Not supplied - must be purchased) to connect deflector to the outlet hole D of the hood. In case the hood is to be used in extraction mode, then the deflector must not be mounted and fit a vent hose (12 - Not supplied - must be purchased) to connect outlet hole D of the hood to the outside. � Make electrical connection (13), but leave the hood disconnected from the main circuit board. � Insert the vapour screen (Not supplied - must be purchased - see Special Accessories and page 17 on the motor housing and fix it with four screws M4x35 (14). � Fix the chimney first up (15a) to the chimney support (15b), then on the bottom (16a) to the upper side of the frame (16b) using four screws 2,9x6,5. � Connect the hood the the main circuit board and check if the hood works properly.