DX-SX1H
Checking the lead process
POWER-SW POWER PWB the electrolytic condensers (BI101)
Passing through
Power Transformer 10 pin lead
Check that the lead process is specified as above.
Connect the 2 pin lead from BI101 under the PWB via the nylon band A .
If any one of the bands shown in Fig. 66 is removed for some reason, be sure replace it to the original position and same appearance as before.
Tie the 2 pin lead at back of the PWB. Make the 2 pin lead Tie the 8 pin lead tight as possible. and the 10 pin lead at the two positions.
WIRING OF PRIMARILY SUPPLY LEADS (FOR U.K. ONLY)
Figure 66
Main PWB (CNP308)
� 66 �
Connect 2 pin lead via the 2 Pin lead position as shown in the figure and connected take up slack in the direction as from BI101. shown by the arrow to avoid stress on the PWB.