Documentation made available quickly and It is good quality. Thanks.
Tekstowy podgląd strony 167 (kliknij aby zobaczyć)
5
6
7
8
INSTALLATION OF THE UNIT Installation using the supplied display stand
Be sure to fix the supplied stand to the installation surface. Use commercially available M8 bolts that are 25 mm longer than the thickness of the installation surface. 1. Fix the supplied stand to the installation surface at each of the 4 prepared holes using commercially available M8 bolts . 3. Fix this unit using the supplied washer and bolt.
A
B
Front
798 mm (31-7/16 in.) (Bolt hole thread pitch) Rear
Use a 6 mm (1/ in.) hex
4
wrench to bolt them.
110 mm (4-5/16 in.)
C
2. Set this unit in the stand.
CAUTION This display unit weighs at least 30 kg (67 lbs) and has little front-to-back depth, making it very unstable when stood on edge. As a result, two or more persons should cooperate when unpacking, moving, or installing the display.
D