...instrukcja serwisowa w pełni czytelna i kompletna. Dziękuję!
Tekstowy podgląd strony 14 (kliknij aby zobaczyć)
PV-V4525S / PV-V4535S-K / PV-455S-K
5.1.1.1.
Notes in chart
1. Installation of Top Panel Install the Top Panel front portion at a downward angle so that the tab on the Front Panel Ass�y fits into the hole in the Top Panel. Then, lower the rear portion into place and tighten 4 Screws (501, 502). 2. Installation of Front Panel Ass�y CAUTION: Opener Lever may be damaged when Front Panel Ass�y is installed, with Cassette Door-Lid of Front Panel Ass�y and Opener Lever of Cassette Up Ass�y set incorrectly. a. When installing the Front Panel Ass�y, swing the Cassette Door-Lid all the way open until the Cassette Door tab clears the Opener Lever. b. Make sure that all locking tabs are aligned properly. Then, press the Front Panel straight in.
Fig. D4
b. Make sure the phase hole of the Main Cam Gear on the bottom side of Mechanism Unit is in EJECT position.
Fig. D5
c. Install the Mechanism Chassis straight onto the Main C.B.A. so that the Photo Transistor Unit (712) clears the hole in the Mechanism Chassis and that 3 Connectors (P5002, P4001, P6201) are aligned and seated securely.
5.2.
MECHANISM SECTION
Refer to the Service Manual for R4-Mechanism Chassis for PVModel (Order No. MKE0401000C1).
Fig. D3
3. Installation of Mechanism Chassis and Cassette Up Ass�y onto Main C.B.A. a. Make sure the Mode Select SW. on the Main C.B.A. is in EJECT position. If not, rotate the Mode Select SW. until the alignment projection is in the EJECT Position.