Documentation made available quickly and It is good quality. Thanks.
Tekstowy podgląd strony 48 (kliknij aby zobaczyć)
XC-LA21
The following work is done before Drawer is put on Chassis. (1) It is confirmed that Carriage 300 is clamped, and Clamper has fallen. (2) It is confirmed to Drawer to be built in neatly in order of Carriage 200 and 100. (3) Arm Stopper B is moved horizontally (inside) as shown in the figure below. A (4) Pulls Slider 2 until the lock comes off to the direction of ta front side. B Note : Do not lift Arm Stopper B for above when you move Arm Stopper B. There is a possibility to bend the spring when Arm Stopper B is lifted, and the spring bends. And, when Arm Stopper B becomes floatage feeling, Drawer is caught. Coming off in the spring is noted.
7 Assembly of Drawer and Chassis
5 Its right side is slowly lowered up to the angle by which Bevel
Gear can do in the slide while doing Drawer back and forth by about 5mm.
4
3 5
2 Lac teeth
Bevel Gear
Arm Stopper B
Gear Idler A (black)
A
Slider 2 The lock comes off.
6 When peeps from the inside of Drawer when the receiving part
of Gear is fixed into the concave part of Bevel Gear, the place where it is fixed is comprehensible. Coming off of a black gear is noted. Direction of front
B
Drawer
1 This
part of Drawer is put on Chassis like the arrow. 10mm is opened.
6
Drawer
1
Concave of Bevel Gear Receiving part of Gear
Chassis
7 8 2 The lac teeth and Gear Idler A are matched, and it is pressed
under the diagonal lightly.
3 Right this side of Drawer is lifted. 4 Drawer is moved back and forth, and stops Drawer with the
point which it enters left.